If not in stock, this product manufacture lead time is approximately 5 to 6 weeks.
This is a solid block of foam which is covered with a hygienic, strong and tear-resistant PVC cover. Graphics are applied to the exterior of block furniture to give a lifelike representation but they do not function, i.e doors, draws etc. do not open.
Risk assessments should be conducted by the trainer to identify the level of training/instruction conducted is appropriate, and that any piece of equipment that is used for that training is suitable and all safe guards are in place.